# Released capacity worksheet

Use this to estimate how much capacity an AI-supported workflow released, and where it went. All figures are estimates. Keep ranges, and record where each came from.

## 1. Define the unit

- Unit of work (one invoice, one review, one report):
- What counts as an acceptable result:
- Observation period:

## 2. Time saved

| Item | Value | Source |
|---|---|---|
| Baseline active time per unit (before) |  |  |
| Active time per unit (after) |  |  |
| Volume per period |  |  |
| Time saved (baseline minus after, times volume) |  |  |

## 3. Time added

| Item | Value | Source |
|---|---|---|
| Checking the output |  |  |
| Corrections and rework |  |  |
| Upkeep of the tool |  |  |
| Support and questions |  |  |
| Total time added |  |  |

## 4. Net capacity

Time saved minus time added: ______ (range: ______ to ______)

## 5. Where it went

Check what actually happened. Report each separately.

- [ ] Absorbed growth (more work done by the same people)
- [ ] Avoided a hire
- [ ] Reduced spend (something was actually cancelled or cut)
- [ ] Evaporated (time freed, nothing changed)

Spending savings and released time are separate lines. Do not report capacity as cash.

From tommymagee.com/resources/released-capacity
